Clip on reefer container Generator Model CL20-AM
Prime Power(KW/KVA) 16 18
Standby Power(KW/KVA)20 22
Rate Power (r.p.m) 1500 1800
Brand of Engine 4FA2.5-G2
Brand of Alternator PR20
Rate Voltage(V) 200-480
Power Factor 0.8
Phase Number 3
CL20-AM Fuel Tank: 180L for 45 hours working time
The Fuel Consumption (L/H)
100% loading 4.4
75% loading 3.5
50% loading 2.2
Engine Date : Engine Type: 4FA2.5-G2 AlternatorType PR20 Rate Power 18 KW
Frequency 60HZ Max. Power 20 KW Max. Capacity 22 KVA Compression ratio: 18:1 Type Injection System: Inline
Rate Voltage 200- 480V Aspiration: Naturally aspirated Rate Speed :1800 rpm Start method: Electric start Excitation Way Permanent magent No. of Cylinders: 4
IP Class IP22 Bore ^ Stroke : 90 mm ^ 100mm Displacement: 2,5L Power Factor 0.8
Alternator Start method:Electric start Excitation Way Permanent magent No. of Cylinders: 4 IP Class IP22 Steady-state Voltage Regulation ≤±1% Steady-state Current Regulation ≤1% Voltage Waveform Distortion Factor THD ≤3% Combustion system: Direct Injection Telephone Harmonic Coefficient THF≤2% Standard: GB/T2820 Rate Frequency :50HZ/60hz Standard:GB/T1147.1 Power Factor : 0.8 Insulation Grade:H Cooling way:Forced water cooling Voltage-regulating System: AVR automatic voltage control Transient voltage regulation -15%~+20% Exhaust System Overload Capacity 1.5le≥2min Exhaust temperature (ºC) ≤600 The Phone Affects the TIF Coefficient ≤50 Lubrication System Cooling Air Temperature 258~313K(-15ºC~40ºC) Method of Lubrication Pressure splash combination Relative Humidity ≤ 90% Pitch :2/3
Control system We providing the control box Including 2FV Control system:
1.One touch to control the frequncy between 50hz/60hz
2.Arbitrary conversion voltage from 200-480V
3.Full display of current, voltage, water temperature, time speed and other real-time data.
4.3 phases breaker
5.Starter switch
6.Operation mode switching switch
Factory View : Other Rated Products :
FAQ 1. What's the nearest export seaport to you?
We will choose Ningbo seaport or Shanghai seaport.
2. What are your terms of payment?
We will accept T/T, LC and DP.
3.How long is your delivery time?
Depending on the customers purchase diesel generators' configuration, customer demand for delivery, and our parts inventory, etc.
Generally,it takes 7-20 workday for open type diesel generators and 10-25 workdays for silent diesel generators.
4.What's your MOQ?
1 unit, if the quantity is big, we will give the better price.
5.How much is the ocean freight?
It depends on the destination seaport.
6. How to pack the products?
For better protection of products, customers are advised to use FCL transport, try not to ship by LCL.
We will wrap the film around our diesel generators or use fumigation-free wooden boxes.
The cost of the wooden cases must be accounted for separately.